Home Improvement Asked on November 16, 2021
Just started cleaning up my basement and trying to make some livable space for cheap.
Right now we just have the concrete floor from the foundation, It is not level and it is very rocky ( Not smooth at all).
I plan to pour self leveler until the floor is smooth and level, then I will roll on the epoxy.
Will the epoxy provide sufficient protection for the self leveling concrete?
I saw on another thread that someone said to use a concrete resurfacer. Which means it isn't self levelling. So the work to get it flat will be about 3000 more calories than your self levelling idea. But from what i know about floors you have to wait 20 days after pouring concrete before putting the epoxy down. Because of moisture evaporation and the drying process. Good luck.
Answered by Brian OLeary on November 16, 2021
Get help from others!
Recent Answers
Recent Questions
© 2024 TransWikia.com. All rights reserved. Sites we Love: PCI Database, UKBizDB, Menu Kuliner, Sharing RPP