TransWikia.com

P&ID questions on reports, connection, etc

Engineering Asked by Sahil Syazwan on July 31, 2021

Good day to all of you. I got some questions in my mind regarding on P&ID:

  1. In electrical, symbol will have their own default reference name for example "Motor" will use "M" , while for wire they will have "N" for "neutral". So in P&ID they will have specific naming for pipe lines and also instrumentation lines. Can i have, this instrumentation lines reference as "Signal Line 1" or better stay as "Software Link"?

enter image description here

  1. For reports wise, is it necessary to separate between Pipe and Instrumentation Line? For example, Pipe would have Pipe connection report while Signal Line would have Signal Line connection report? How about their BOM report?

3.Do Instrumentation Line should have the same details as Pipe Line ? Is the information suitable and sufficient?

  • Name
  • Brand
  • Model
  • Spec
  • Service
  • Insulation Type
  • Insulation Thickness
  • Size/Gauge
  • Order No
  • Supplier
  • Remarks
  • Length
  1. Based on the diagram, how the connection report should be for Signal 01 and pipeline 01?

For pipeline 01

"pipeline 01 connected to IND001 via Signal 01 & T003 connected to T004 via pipeline 01?".

For Signal 01

"Signal 01 connected to IND001"?

enter image description here

  1. Is this symbol generally used in P&ID as to link to another pipe?

enter image description here