Engineering Asked by Kyle - Traffic Ops on August 16, 2021
I am trying to determine the force required to vertically lift a typical traffic sign post (round, square and/or channel) out of the ground based on typical soil types at standard installation below grades depths of 30" and 36". To make the calculation simpler, assume that the post coming out of the ground is just a 4" stub and that actual sign assembly is not part of the equation.
Answered by r13 on August 16, 2021
Get help from others!
Recent Answers
Recent Questions
© 2024 TransWikia.com. All rights reserved. Sites we Love: PCI Database, UKBizDB, Menu Kuliner, Sharing RPP